Master BIM with Expert-Led Courses
Transform your AEC career with structured, practical BIM courses designed by Vignesh Balu, a BIM expert and industry thought leader. These courses empower architects, engineers, and contractors to implement Building Information Modeling (BIM) standards like ISO 19650, and gain real-world digital construction expertise.
Why Learn BIM from This Blog
- Learn directly from real project experience and global BIM implementations.
- Gain clarity on LOD, COBie, CDE, and BEP workflows.
- Understand Revit, Navisworks, BIM 360, and other essential tools.
- Receive guidance aligned with ISO 19650 international standards.
- Build skills that employers and project owners value most.
๐ Vision: To shape the next generation of BIM-ready architects, engineers, and contractors driving sustainable construction.
Available BIM Courses
Revit for Architects
Learn to create, manage, and collaborate architectural models using Revit.
- LOD 100–400 workflows
- Family creation & detailing
- Construction documentation
- Exporting IFCs & integration with CDE
๐ Outcome: Become job-ready as a Revit BIM Modeler (Architecture).
๐ Duration: 30 hours
๐ Level: Beginner to Intermediate
Revit for Structural Engineers
Master structural modeling, detailing, and coordination.
- Rebar modeling, analytical tools
- BOQ extraction
- Clash-free coordination
- Integration with Navisworks
๐ Outcome: Confidently produce coordinated BIM models & drawings.
๐ Duration: 30 hours
๐ Level: Intermediate
Revit for MEPF Engineers
Learn coordinated MEPF modeling and BIM integration.
- Duct, pipe, and cable tray modeling
- Clash detection workflow
- 4D simulation & 5D cost estimation basics
- Sheet set creation
๐ Outcome: Deliver MEP BIM projects with zero clashes.
๐ Duration: 35 hours
๐ Level: Intermediate to Advanced
BIM Implementation & ISO 19650 Course
Become a BIM coordinator or BIM manager with full ISO 19650 understanding.
- BIM Execution Plan (BEP) development
- Common Data Environment setup
- Information delivery cycle
- Asset Information Model (AIM) and COBie
๐ Outcome: Learn to manage BIM at an organizational level.
๐ Duration: 40 hours
๐ Level: Advanced
COBie Course
Master structured asset data exchange using COBie workflows
- COBie spreadsheet format
- Linking model data
- Asset information handover
๐ Outcome: Efficient data handover for FM & Digital Twins.
๐ Duration: 16 hours
๐ Level: Advanced
Learning Format
All courses are available in flexible learning modes:
- ๐น Online Instructor-Led Sessions
- ๐งพ Recorded Video Lessons
- ๐ Project-Based Assignments
- ๐ Completion Certificates
Who Can Learn These Courses
- Architecture, Civil, Mechanical, Electrical, and Plumbing Engineers
- BIM Modelers & Coordinators
- Project Managers, Contractors, and EPC Consultants
- Students aspiring to start a BIM career
Course Outcome
After completing the courses, learners will:
- Deliver coordinated BIM models up to LOD 500.
- Apply ISO 19650 workflows in real projects.
- Use Revit, Navisworks, and BIM 360 confidently.
- Prepare BEPs, COBie sheets, and 4D/5D simulations.
- Be ready for BIM roles: Modeler, Coordinator, or Manager.
Enroll Now
๐ Register for a Course
๐ฉ Contact: training@lupitertech.com
๐ Call: +91 8015463968
Join the movement — learn BIM the right way and lead the digital future of construction.